This addition was constructed in three phases. The initial phase was a Christian Activities Center. The second phase was an administration and library wing. The final phase consisted of a new 1,100-seat sanctuary framed in structural steel. The cantilevered balcony was framed with structural steel.
Greenville, Tennessee